Commissioning and Initial Performance of the Dark Energy Camera Liquid Nitrogen Cooling System
2012
The
Dark EnergyCamera and its cooling system has been shipped to
Cerro Tololo Inter-American Observatoryin Chile for
installationonto the Blanco 4m
telescope. Along with the camera, the cooling system has been
installedin the Coude room at the Blanco
Telescope. Final
installationof the cooling system and operations on the
telescopeis planned for the middle of 2012. Initial commissioning experiences and cooling system performance is described.
Keywords:
-
Correction
-
Source
-
Cite
-
Save
7
References
3
Citations
NaN
KQI