language-iconOld Web
English
Sign In

PHENIX on-line systems

2003
The PHENIX On-Line system takes signals from the Front End Modules (FEM) on each detector subsystem for the purpose of generating events for physics analysis. Processing of event data begins when the Data Collection Modules (DCM) receive data via fiber- optic linksfrom the FEMs. The DCMs format and zero suppressthe data and generate data packets. These packets go to the Event Builders (EvB) that assemble the events in final form. The Level-1 trigger (LVL1) generates a decision for each beam crossingand eliminates uninteresting events. The FEMs carry out all detector processing of the data so that it is delivered to the DCMs using a standard format. The FEMs also provide buffering for LVL1 trigger processing and DCM data collection. This is carried out using an architecture that is pipelined and deadtimeless. All of this is controlled by the Master Timing System (MTS) that distributes the RHIC clocks. A Level-2 trigger (LVL2) gives additional discrimination. A description of the components and operation of the PHENIX On-Line system is given and the solution to a number of electronic infrastructure problems are discussed.
    • Correction
    • Source
    • Cite
    • Save
    18
    References
    20
    Citations
    NaN
    KQI
    []
    Baidu
    map