Belle II Technical Design Report
2010
The Belle detector at the
KEKBelectron-positron collider has collected almost 1 billion Y(4S) events in its decade of operation. Super-
KEKB, an
upgradeof
KEKBis under construction, to increase the
luminosityby two orders of magnitude during a three-year
shutdown, with an ultimate goal of 8E35 /cm^2 /s
luminosity. To exploit the increased
luminosity, an
upgradeof the Belle detector has been proposed. A new international collaboration Belle-II, is being formed. The Technical Design Report presents physics motivation, basic methods of the accelerator
upgrade, as well as key improvements of the detector.
Keywords:
-
Correction
-
Source
-
Cite
-
Save
0
References
436
Citations
NaN
KQI