PACKAGE POWER REACTOR NO. 1 STEAM CYCLE CALCULATIONS
1953
A study was made to determine the best steam cycle arrangement and reactor power requirement for a package power reactor system to supply a remote army station requiring 1OOO kw of electricity and 250 boiler horsepower (7.55 x 10/sup 6/ Btu/hr) of steam heating load. It was assumed that gross electric power requirement would be 1300 kw of electricity. (auth)
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
0
References
0
Citations
NaN
KQI