DPOD2014: A new DORIS extension of ITRF2014 for precise orbit determination
2019
Abstract To support precise
orbit determinationof the altimetry missions, the International
DORISService (IDS) regularly estimates the DPOD (
DORIS
terrestrial reference framefor Precise
Orbit Determination) solution which includes mean positions and velocities of all the
DORISstations. This solution is aligned to the current realization of the International
Terrestrial Reference Frame(ITRF) and so, can be seen as a
DORISextension of the ITRF. In 2016, moving to the IDS Combination Center, the DPOD construction scheme changed. The new DPOD solution is produced from a
DORIScumulative position and velocity solution. We present the new methodology used to compute DPOD2014 and its validation procedure. In order to present geophysical applications and interpretations of these results, we show two examples: (1) the Gorkha earthquake (M7.8 – April 2015) generates a 3-D mis-positioning of nearly 55 mm of the EVEB
DORISstation at the Everest base camp 90 km from the
epicenter. (2) Applying the results the DPOD2014 realization, we show that the most recent vertical velocity of Thule, Greenland is similar to that observed between 2006 and 2010, indicating further ongoing ice mass loss in the Thule region of northwest Greenland.
Keywords:
-
Correction
-
Source
-
Cite
-
Save
55
References
8
Citations
NaN
KQI