Resistive plate chamber commissioning and performance in CMS
2009
The CMS
muonsystem is conceived for trigger and
muontrack reconstruction. The redundancy and robustness of the system are guaranteed by three complementary subsystems: drift tube in the
barrel, cathode strip chamber in the end-cap and resistive plate chamber in
barreland end-cap. The installation of
muonstations and read-out trigger electronic has been completed in middle 2007. Since than, a remarkable effort has been addressed to the detector commissioning in order to ensure the readiness of the hardware/software chain for the LHC start up operation. At the end of 2007, a test of an entire CMS slice has been performed, involving about 5% of
muonstations. Several thousand cosmic
muonsevents have been collected. Performance of the
barrelchambers are reported.
Keywords:
-
Correction
-
Source
-
Cite
-
Save
4
References
6
Citations
NaN
KQI