Nonlinear Time-Dependent Analysis of the Load-Bearing Capacity of a Single Permanent Shotcrete Lining at the Brenner Base Tunnel
2020
The Brenner Base Tunnel (BBT), a 64 km long railway tunnel between Austria and Italy, is under construction at the time of writing. The complete tunnel system of the BBT will comprise railway tunne...
Keywords:
- Correction
- Source
- Cite
- Save
- Machine Reading By IdeaReader
13
References
2
Citations
NaN
KQI