Nonlinear Time-Dependent Analysis of the Load-Bearing Capacity of a Single Permanent Shotcrete Lining at the Brenner Base Tunnel

2020 
The Brenner Base Tunnel (BBT), a 64 km long railway tunnel between Austria and Italy, is under construction at the time of writing. The complete tunnel system of the BBT will comprise railway tunne...
    • Correction
    • Source
    • Cite
    • Save
    • Machine Reading By IdeaReader
    13
    References
    2
    Citations
    NaN
    KQI
    []
    Baidu
    map