Kostenszparende Teilerneuerung eines kommonalen Heizkraft-werkes durch eine anspruchsvolle GuD-Anlage
1996
The concept of the renewal embraces the installation of a 60 MW gas turbine, a thermo-dynamically demanding triple-pressure waste heat boiler with supplementary firing and the conversion of one of existing steam turbines. In addition, very low capital costs can be achieved by complete utilization of the existing construction materials, infrastructure and numerous individual components